Sep. 17th, 2006

jhetley: (Default)
We have 2/3 (based on number of sides) or 95% (based on actual surface involved) of the sunporch painted. We have 100% of the gallon bucket of primer used, as that 1/3 side or 5% surface is now scraped and primed. We do not have rain forecast until Tuesday, which should allow the morning's paint to dry but which raises serious questions about painting that 1/3-5% tomorrow.

And the home-place still looks like the "Before" shots of a candidate for THIS OLD HOUSE, but we expected that.

I think I shall veg out in front of a football game on TV.

Profile

jhetley: (Default)
jhetley

August 2025

S M T W T F S
      1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31      

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 1st, 2025 10:08 am
Powered by Dreamwidth Studios